The 15k psi Capping Stack arrived at Greensport where it was transported by the “Big John” crane back to land where final preparations were completed to return the capping stack to ASCO.
The 15k psi Capping Stack arrived at Greensport where it was transported by the “Big John” crane back to land where final preparations were completed to return the capping stack to ASCO.
To learn more about MWCC or to report a technical problem,
please use the link below.