Upon arrival at Greensport, the 15k psi Capping Stack underwent pre-deployment testing. The secondary containment cap was installed and multiple barrier pressure tests were performed.
Upon arrival at Greensport, the 15k psi Capping Stack underwent pre-deployment testing. The secondary containment cap was installed and multiple barrier pressure tests were performed.